INSTALLATION PROCEDURE FOR UN-INSULATED LUGS & CONNECTORS - 1.5MM2 - 1000MM2

 
   
INSTALLATION PROCEDURE FOR UN-INSULATED LUGS & CONNECTORS  
 
   
Identify the correct Terminal / Connector for the cable in use. This can be done by checking the marking on the connector or from the labels attached to the packages.
Necessary cable preparation to be done using suitable stripper to remove the insulation to the distance equal to the insertion depth of the connector plus suitable extra allowances. (3 to 5mm)
Brush the surface of the stranded conductor to remove any oxides if present.
Insert the conductor in to the barrel of the connector. Orientation of the palm of the connector
should be ensured for the equipment where it is to be connected.
Suitable crimping dies / tools should be selected to ensure that the joints made are mechanically
strong. Good joint results into good electrical continuity.
Ensure proper crimping series ( as mentioned above ).
Clean the surface where the terminal is to be fixed. Necessary nut, bolts, washer as indicated
should be used.
 